General Assumptions
- At least two exterior doors in each of 25 buildings will be modified for controlled access using proximity readers.
- Five software licenses will be required (maintenance fees are not included in the cost of this initiative).
- 2,034 proximity cards will be issued to replace 1,850 exterior door keys plus 10 percent for building master keys.
- Existing computer network will be used for communications between buildings.
- Installation includes special doors with wiring installed in conduit. Work computed using prevailing wage.
- Installation of card reader doors estimated at $6,000 each; system-compatible, non-card reader doors will cost $1,000 each.
- 6% inflation factor was calculated in years FY08, FY09 and FY10.
- Start-up costs for training and head-in equipment estimated at $132,640 provides:
- All card access computer equipment
- Card access software
- 2,500 proximity cards
- Project management costs
- Conduit and wiring
- Emergency release equipment
- Card access controller equipment
- Technical labor
- Installation labor @ prevailing wage and materials
- Programming
- Training
- Magnetic locking devices
- Power supplies
- Proximity readers
FY2008
|
Building Name
|
Access Reader Doors @ $6,000
|
Non-Access Reader Doors @ $1,000
|
Total
|
|
Start-up
|
|
|
$132,640
|
|
Glass Hall
|
4/$24,000
|
11/$11,000
|
$35,000
|
|
Strong Hall
|
4/$24,000
|
4/$4,000
|
$28,000
|
|
Temple Hall
|
4/$24,000
|
6/$6,000
|
$30,000
|
|
Pummill Hall
|
4/$24,000
|
1/$1,000
|
$25,000
|
|
Sub-total
|
$250,640
|
|
(6% inflation)
|
$15,038
|
|
Total
|
$265,678
|
FY2009
|
Building Name
|
Access Reader Doors @ $6,000
|
Non-Access Reader Doors @ $1,000
|
Total
|
|
Carrington Hall
|
3/$18,000
|
3/$3,000
|
$21,000
|
|
Kemper Hall
|
2/$12,000
|
5/$5,000
|
$17,000
|
|
Craig Hall
|
2/$12,000
|
5/45,000
|
$17,000
|
|
Professional Bldg.
|
4/$24,000
|
7/$7,000
|
$31,000
|
|
Karls Hall
|
3/$18,000
|
5/$5,000
|
$23,000
|
|
Physical Therapy Bldg.
|
2/$12,000
|
1/$1,000
|
$13,000
|
|
Wehr Band Hall
|
3/$18,000
|
0
|
$18,000
|
|
Meyer Library
|
4/$24,000
|
6/$6,000
|
$30,000
|
|
Plaster Student Union
|
4/$24,000
|
9/$9,000
|
$33,000
|
|
Sub-total
|
$203,000
|
|
(6% inflation)
|
$12,180
|
|
Total
|
$215,180
|
FY2010
|
Building Name
|
Access Reader Doors @ $6,000
|
Non-Access Reader Doors @ $1,000
|
Total
|
|
Cheek Hall
|
4/$24,000
|
3/$3,000
|
$27,000
|
|
Hill Hall
|
4/$24,000
|
3/$3,000
|
$27,000
|
|
Ellis Hall
|
4/$24,000
|
4/$4,000
|
$28,000
|
|
Art Annex
|
2/$12,000
|
3/$3,000
|
$15,000
|
|
McDonald Arena
|
3/$18,000
|
4/$4,000
|
$22,000
|
|
Kings Street Annex
|
2/$12,000
|
2/$2,000
|
$14,000
|
|
Madison Hall
|
2/$12,000
|
0
|
$12,000
|
|
Greenwood
|
4/$24,000
|
2/$2,000
|
$26,000
|
|
Freddy/Mil Science
|
2/$12,000
|
0
|
$12,000
|
|
Forsythe Athletic Center
|
3/$12,000
|
1/$1,000
|
$13,000
|
|
Taylor Health Center
|
2/$12,000
|
0
|
$12,000
|
|
Hammons Hall
|
4/$24,000
|
5/$5,000
|
$29,000
|
|
Sub-total
|
$237,000
|
|
(6% inflation)
|
$14,220
|
|
Total
|
$251,220
|
Note: To support a conversion from Zip Card readers to readers addressed within this proposal it will take one and one half clerical positions at annual salary cost including benefits - $51,200.00
Comments